Econ. Environ. Geol. 2024; 57(3): 293-303

Published online June 30, 2024

https://doi.org/10.9719/EEG.2024.57.3.293

© THE KOREAN SOCIETY OF ECONOMIC AND ENVIRONMENTAL GEOLOGY

Ecological and Geomorphic Fallout of Escalating River Mining Activities: A Review

Sk. Rakibul Islam, Rafi Uddin*, Miftahul Zannat, Jahangir Alam

Department of Civil Engineering, Bangladesh University of Engineering and Technology (BUET), Dhaka-1000, Bangladesh

Correspondence to : *1704141@ce.buet.ac.bd

Received: November 10, 2023; Revised: June 2, 2024; Accepted: June 3, 2024

This is an Open Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided original work is properly cited.

Abstract

River mining, the extraction of sand and gravel from riverbeds, is rising at an alarming rate to keep pace with the increasing demand for construction materials worldwide. The far-reaching deleterious effects of river mining include the lowering of water levels, the augmentation of turbidity, and the erosion of riverbanks, i.e., the disruption of water flow and alteration of river morphology. Aggregates demand, geolocation, and the economy of Bangladesh accelerated illegal extraction. However, limited research has been carried out in this region, despite the severe impact on aquatic and terrestrial ecosystems. To address the corresponding consequences and direct the scope for further research, it is required to evaluate existing studies of other countries having similarities in river morphology, climate, economy, and other related parameters. In this respect, based on previous studies, the effects of sand extraction are particularly prominent in India, having 54 cross-boundary rivers with Bangladesh. The geological profile of numerous rivers in the past decades has been altered due to natural aggregate mining in the Indian subcontinent. Hence, this study focused on relevant research in this region. However, the existing research only focuses on the regional portion of the aforementioned international rivers, which lacks proper assessments of these rivers, taking into account especially the mining effects. Moreover, several global rivers that have similarities with Bangladeshi rivers, considering different parameters, are also included in this study. The findings of this article underline the pressing need for more efficacious measures to address the adverse effects of river mining and safeguard ecosystems and communities globally, especially in the Indian subcontinent, where the situation is particularly vulnerable. For this reason, targeting the aforementioned region, this review highlights the global evidence in assessing the future effects of river mining and the need for further research in this field.

Keywords sand extraction, riverbed, ecosystem, morphology, and channel instability

  • River mining, the extraction of sand and gravel from riverbeds, is increasing in developing countries, causing detrimental effects such as altered river morphology, reduced water levels, increased turbidity, and erosion, endangering aquatic and benthic life. Bangladesh, along with the Indian subcontinent, is particularly vulnerable to these impacts due to extensive natural aggregate mining. Urgent measures are indispensable to address these adverse consequences, emphasizing the importance of further research to assess and mitigate the future effects of river mining.

Sand mining and trading is a common sector in the construction industry. Availability and easy access to riverbeds make it popular, especially in developing countries. The total value created by the sand industry was equivalent to USD 1.71 billion in 2016 in the United States (Department of Economic and Social Affairs/United Nations Statistics Division, 2018). The natural sedimentation rate somehow meets the requirement of fine aggregates having favorable physical properties as a building material (Harrison et al., 2005), (Geology & Goldman, 1964). However, mining sand from flood plains disrupts the natural flow of water and alters the sediment's accumulation and movement patterns, which, as a result, threatens the health of the aquatic environment. In fact, floodplain mining acts as a highpowered suction pump degrading soil, water quality, and the aesthetic impact of the area (Sreebha & Padmalal, 2011a). Moreover, mining indirectly changes sediment transport rates, causes the widening and deepening of river channels, and the development of river bluffs and lumps which can exacerbate the issue (Jose et al., 2014), (Sreebha & Padmalal, 2011a). Increases in turbidity, river bank erosion, land degradation, salinity intrusion, and lowered water tables are a few of the indirect consequences of uncontrolled aggregate mining from stream beds (Piyadasa, 2011).

Considering the geology, river networks, and corresponding sedimentation, Bangladesh, the largest delta in the world, is now in a blooming phase of the construction industry. Three major rivers, the Ganges, the Brahmaputra, and the Meghna, are among the most sediment-laden rivers in the world. These rivers, with their numerous tributaries and distributaries, built up the Ganges–Brahmaputra–Meghna (GBM) Basins (Figure 1), These three rivers originate and flow through Nepal, Bhutan, Tibet region of China and India before entering Bangladesh and finally discharging into the Bay of Bengal. However, with approximately 90% of the catchment area of the total river system located outside the country, Bangladesh's situation with regard to surface water is very vulnerable. Fifty-seven rivers are common in India and Bangladesh (Islam, 1992; Milliman & Meade, 1983; Sood & Mathukumalli, 2011). Every year, the cross-boundary rivers carry a large sediment load to the Bengal Basin (M. R. Islam et al., 1999).

Fig. 1. Ganges–Brahmaputra–Meghna (GBM) Basins (M. R. Islam et al., 1999).

Globally, illegal sand mining is found to be very common (Rege, 2016; Young & Griffith, 2009); particularly in developing countries where government regulations are relatively weaker (Gavriletea, 2017). For instance, in India, in the discourse of sand mining, ‘sand mafia’ is a very commonly used term (Peduzzi, 2014; Rege, 2016). In Bangladesh, the print and digital media often feature news on illegal sand mining in different river basins. However, the lack of proper statistics on sand mining in Bangladesh makes it difficult to evaluate the consequences of sand mining (Bari & Haque, 2022; Rabbani & Panday, 2022). While the detrimental effects of river sand mining are well documented globally, there is a significant knowledge gap regarding the specific consequences in Indian subcontinent, particularly vulnerable due to its dependence on these transboundary rivers and the booming construction industry. This review aims to bridge this gap by analyzing existing research on sand mining in regions with similar characteristics globally and attribute similar characteristics in the domain of Indian subcontinent, informing future research directions.

The presence of sand mining has significant effects on morphological characteristics such as channel bed degradation, erosion of riverbanks, and change in the plan form of a river (Collins & Dunne, 1990; Sear & Archer, 1998). The mechanism behind the morphology alteration is related to hydrodynamic characteristics, including velocity profile, higher order moments, and turbulent kinetic energy fluxes in the pit region that affect the morphology and bedload transport of the channel (Barman et al., 2019).

In the southern part of India, the Periyar River is of utmost significance to the economy of Kerala. The morphology of this river is similar to other perennial rivers in that region. Prolonged sand mining in the Periyar River for the industrialization and urbanization of Kerala recorded an annual bed lowering of 0.19 m/year (Figure 2). From 1975 to 1995, approximately 50% reduction in channel depth was observed. The lowering intensity increased markedly in the last 2–3 decades (Padmalal et al., 2008). Similar to the Periyar River, mining activities also disrupted the natural flow of the river Ganga by dividing it into smaller stream sections (Kamboj & Kamboj, 2019). However, limited studies lack the proper documentation and data in this region. The dredging effect, to some extent, can represent the scenario in Jamuna River (Figure 3), including the changes in the width of the river/channel, bank line shifting, channel migration tendency, and incidence map of the river/channel in the vicinity of the study reach (around Jamuna Bridge and Sirajganj Hard Point area) (Rahman et al., 2021).

Fig. 2. Riverbed lowering of Periyar river from 1980 – 2000 (Modified from Padmalal et al., 2008).
Fig. 3. Effect of Dredging in Jamuna River for the year 2000 to 2018 (Rahman et al., 2021).

To illustrate the challenges faced by non-perennial rivers, we examine the Kangsabati River located in West Bengal, India. This seasonal alluvial river shares characteristics with the braided rivers of Bangladesh, and both face the additional stress of sand extraction activities. The Shields parameter, which is used to calculate the initiation of motion of sediment in a fluid flow is highly affected in this river, resulting in reduced transport capacity and initiated turbulent flow in pit sites, which gradually converted into a pool (Figure 4) (Bhattacharya et al., 2019).

Fig. 4. Channel geometry from Raipur to Bikrampur between 2002 and 2016 (Modified from Bhattacharya et al., 2019).

Changes in the rate of bed-material supply result in the transformation of channel geometry. Hence, depending on the changes in flow rate and supply of sediment, river channels may be evolved into several bed-form units. An imbalanced supply of deposits and transportation capacity of the stream causes the incision (downward cutting), which is basically a natural process. However, human activities, including agriculture, dam construction, sand mining, and imposition of erosion control, can accelerate the process of incision. Lowering of base levels for the tributaries due to channel incision consequently causes the destabilization of the entire watershed landscape (Lach & Wyżga, 2002; Shields et al., 1994; Wyżga, 2007). Being one of the most harmful human activities, sand mining significantly reduces the downstream flow of sediments and speeds up the incision, which can proceed up to tributaries (Ashraf et al., 2011; Harvey & Schumm, 1987). Hence, the impacts of sand mining on river geomorphology are required to be better understood (Padmalal et al., 2014).

In active channels, excavating a mining pit can alter the stream bed profile and create a knick point with a steeper gradient which attributes increased stream power, causing bed erosion. The process of such erosion is called headcutting or knick-point migration. Head-cutting transports a considerable amount of stream bed material to be deposited in the excavated areas (Figure 5). Through the increase of the channel depth, pit excavation reduces the flow velocities causing sediment deposition at the mining site. Water leaving the pit has higher flow energy and fewer sediments compared to the carrying capacity of the stream. The bedload- free water causes erosion of its bed and banks and tries to regain sediment load partially. Considering the behavior of eroding the riverbed due to higher stream power, such type of water is referred to as ‘hungry water’ (Kondolf, 1994). The effects consequent channel incision of sand mining can proceed up to the mining prohibited areas, including the site of bridge construction and other engineering structures. A bridge built over the Bharathapuzha river near the Shornur locality in southwest India collapsed, suggesting significant evidence of the destructive effect of sand mining (Padmalal et al., 2014; Kondolf, 1994).

Fig. 5. Incision due to instream sand mining. (a) knick point creation; (b) The knick point migration and erosion of bed downstream for hungry water (Padmalal et al., 2014).

Considering alluvial rivers, channel narrowing was exhibited as a response to river mining downstream in Italian rivers. In Piave and Sesiarivers, the narrowing process was so intense that it altered the initial morphological conditions of the rivers from Braided to Transitional (Surian & Rinaldi, 2003). In recent decades in Italy, the alluvial channels have experienced notable configuration adjustments, including narrowing up to 80% and incisions up to 8 m-10 m. (Surian et al., 2011). From the perspective of stream volume and flow, similar to major rivers in Bangladesh, The Pearl River, the second largest amount of water in China, over the last decades, experienced significant down-cutting at Makaou hydrological station (Figure 6) (Surian et al., 2011). According to several studies, down-cut records obtained from different countries of different continents are enlisted in Table 1 and shown in Figure 7.

Table 1 Sediment mining effects on alluvial river morphology considering channel incision

RiverCountryYearDeepest down cutReferences
JaramaSpain1960-1990s4 m(Rinaldi et al., 2005)
Po RiverItaly1880-1990s1-6 m(Rinaldi et al., 2005)
Manawatu RiverNew Zealand1967-19760.25 m(Rinaldi et al., 2005)
Wisłoka RiverPoland1950s-1990s2.6 m(Rinaldi et al., 2005)
Gaoyao, PearlChina19956.3 m(Lu et al., 2007)
Makou, PearlChina19987.1 m(Petit et al., 1996)
Sanshui, PearlChina20035.8 m(Rinaldi et al., 2005)
Rhone RiverFrance1847-19524.5 m(Petit et al., 1996)

Fig. 6. Cross-section channel profiles in different years between 1990 and 2003 at Sanshui station (Modified from Surian et al., 2011).
Fig. 7. Alluvial rivers with down-cut records across different countries of different continents.

Sand mining significantly alters channel geometry and causes incision, destabilizing watershed landscapes and impacting tributaries. This phenomenon, observed globally, has serious implications for the Indian subcontinent's dynamic river systems, such as in Bangladesh and India. For example, the collapse of a bridge over the Bharathapuzha River in India highlights the urgent need for stringent monitoring, regulation, and community engagement to manage sand mining. Comparative studies from Italy and China reveal similar issues, providing valuable insights for mitigating these effects locally. Addressing sand mining impacts requires a multifaceted approach, including adaptive infrastructure design and leveraging global research to protect riverine ecosystems and dependent communities in the Indian subcontinent.

Geomorphological changes, including alteration of bed level in rivers are also accompanied by lateral instability, which triggers bank erosion and channel migration (Rinaldi et al., 2005). In Central Italy, Southern Poland, and China, it is emphasized that instream sand mining is a prominent cause of incidents such as rapid channel incision and subsequent river bank failure (Rinaldi et al., 2005; Lu et al., 2007; Rinaldi, 2003) Along with other indirect ecological effects, this channel instability may also cause significant riparian vegetation loss and direct habitat loss for species (Newell et al., 1999; Sandecki, 1989). Notable alteration of bed-level in Arno River, Italy, was observed over the last 50 years (Figure 8). The mechanisms behind the loss of vegetation and the consequent effect on aquatic life related to the incision-induced bank failure and streambed shallowing (Figure 9), which cause the loss of hectares of fertile land, valuable timber resources, and wildlife habitats in riparian areas. Mining-induced bed degradation and other channel changes may not develop for several years until significant channel-adjustment flows occur, and adjustments may continue long after extraction has ended (Abdulazeez, 2016). Similarly, in the subcontinent, such instability can result in the loss of fertile land, timber resources, and wildlife habitats. The effects of mininginduced bed degradation and channel adjustments may persist long after extraction has ceased, necessitating proactive management and mitigation strategies.

Fig. 8. Alteration of bed-level along the Arno River. (A) Location of dams, alluvial reaches, and Arno River system mining sites before 2000. (B) Lowering of bed level of the Arno River after 1845 (Rinaldi et al., 2005).
Fig. 9. Diagram of channel cross sections showing (1) a typical sand-gravel bar about the low-flow channel, riparian zone, and water table, and (2) the wide shallow channel that results from unrestricted mining characterized by bank erosion, braided flow, sedimentation, and increased water temperatures (Ayyam et al., 2019).

Entirely or partially to a large extent, removing the plant and soil profile threatens biodiversity and aquatic (Newell et al., 1999; Sandecki, 1989). Moreover, sand mining and habitat destruction decrease the river's fish population (Arun, 1999; Kurup et al., 2004). Water turbidity resulting from mining deprives aquatic life of oxygen and photosynthesis (Supriharyono, 2004). High turbidity inhibits aquatic lifés feeding, breathing, and reproducing ability. Indiscriminate sand and river mining stir up clouds of fine organic and inorganic particles in the underlying waters, which are later transported by the river flows and collected in mining-free zones (Sreebha & Padmalal, 2011b). Benthic creatures and beneficial food-providing insect larvae, including mayflies, dragonflies, caddisfly, and other Diptera, also get reduced for the anthropogenic activities in mining spots. India's Achankovil river is one of the notable examples of such types of impacts (Sunilkumar, 2002). Heavy equipment for sand extraction affects soil compaction and infiltration, which can be detrimental to flora and fauna (Sreebha & Padmalal, 2011a), (Hill & Kleynhans, 1999). They generate noise pollution, disturb nesting/breeding, and reduce animal diversity (Byrnes & Hiland, 1995). The riparian vegetation that serves as a resting and breeding area for migratory birds is destroyed by indiscriminate sand mining from rivers (Sreebha & Padmalal, 2011b). Riverbank slumping, channel incision, and dropping water table harm riparian plants and fauna (Sreebha & Padmalal, 2011b). Loss of instream vegetation causes spawning abnormalities in photophilic and psammophilous fishes and impacts protein and energy flow to fish-feeding aquatic and terrestrial organisms (Cowx & Welcomme, 1998). Macroinvertebrates collapse was also observed in a study due to habitat deterioration in sand mining sites (Zou et al., 2019). Furthermore, excessively piled and discarded mining waste, organic matter, and oil leaks from machinery and vehicles used for excavation contribute to a rise in shortterm turbidity (Ashraf et al., 2011 ;Wu et al., 2007; Cao et al., 2017).

While sand mining significantly disrupts aquatic ecosystems, posing severe threats to biodiversity in the Indian subcontinent applying the global insights can help mitigate the destruction of riparian vegetation, prevent riverbank erosion, and maintain healthy aquatic ecosystems, ensuring the sustainability of these vital resources.

The natural balance between the freshwater and the saline water is disturbed by the rampant illegal sand mining and also the excess groundwater withdrawals. Sand mining lowers the groundwater levels, reduces freshwater flow into the coastal aquifers, and ultimately causes saline water intrusion (Damodaran & Balakrishnan, 2018). The incision in minor river valleys with instream mining may diminish alluvial aquifer storage by 1% - 6%, according to Lake County, California's Planning Department (County, 1992). Sand mining causes vast, deep excavations in the riverbed, lowering the groundwater table and leaving wells on the embankments (Matlock, 1965; Herrling, 1982). Wells near sand mines are noticed in the gradual lowering of the water table in India's lowlands and midlands. More than 60% of Manimala river's floodplain wells are severely water-stressed due to sand mining (Sreebha & Padmalal, 2011b). Moreover, in Sri Lanka, sand extraction tripled in the Nilwala River, causing the lower river reaches to move inland by 50 kilometers in the last two decades (Piyadasa, 2011).

Saline water intrusion in the Vietnamese Mekong Delta (VMD) is primarily driven by three human activities: riverbed incision (caused by both riverbed mining and dam construction), sea level rise, and land subsidence corroborated by experimental studies (Loc et al., 2021a). According to an investigation of hourly-to-daily hydrological data series from 11-gauge stations across the (VMD), riverbed mining can incise the channel by up to 15 cm/year and aggravate saline intrusion (Loc et al., 2021b). Eslami et al. (2019) predicted that a 2 m riverbed incision in the coastal channel might increase salinity intrusion length by 5 km and salt concentration by 1.5 Practical Salinity Unit (PSU) 20 km from the sea (Eslami et al., 2019). Based on the experimental investigation in Periyar river, the freshwater and saline water interface is demarcated (Figure 10) (Damodaran & Balakrishnan, 2018).

Fig. 10. Fresh–saline groundwater interface of the study area (Damodaran & Balakrishnan, 2018).

Understanding the relationship between sand mining and the lowering of groundwater tables, as well as the intrusion of saline water, is crucial for addressing environmental and socio-economic challenges in the Indian subcontinent. By understanding and addressing these dynamics, policymakers and stakeholders in the Indian subcontinent can develop strategies to mitigate the adverse impacts of sand mining on groundwater resources and coastal ecosystems, safeguarding both environmental integrity and community well-being.

The aim of this research is to review the multidisciplinary effects of sand mining in different regions of the world and especially in the Indian subcontinent. Based on the review, the following presumptions can be drawn:

1. In recent decades, indiscriminate sand extraction from river beds has escalated to maintain the same rate of progress in the construction industry. However, in developing countries, there are no established guidelines for harvesting river sand (Alvarado-Villalon et al., 2003).

2. Excessive sand mining seeds morphological changes, including channel incisions and narrowing as well as falling groundwater levels, remarkably disrupted river flow, which leads to instability in the surrounding ecosystem and the communities depending on it.

3. Knick point migration directly related to sand mining is frequently observed in most of the significant rivers in the Indian subcontinent. Cross-sectional properties of the rivers are severely affected in the long run.

4. As a secondary effect of sand mining, disruption in standard aquatic biological processes due to increased turbidity, BOD, and the release of toxic compounds into the water, makes it harder for pelagic and benthic organisms and plants to survive.

5. Exposure to radioactive materials from extraction sites impose serious health concern depending on the availability of such substances, and aquatic life is not out of such danger.

6. In situations where local development necessitates the collection of aggregates, the challenge lies in balancing construction demands with environmental sustainability. To address this issue, one viable alternative as suggested by literature is the reuse of industrial by-products as substitutes for river sand in concrete production, specifically as aggregates. This approach not only mitigates the environmental impact associated with extensive river sand mining but also provides a sustainable solution to managing industrial waste, thereby reducing land pollution. By adopting this method, construction projects can maintain a steady supply of aggregates while contributing to a more sustainable and environmentally conscious industry(Santhosh et al., 2021).

Though the existing studies focused on the effects of sand mining from different perspectives, still in the reviewed literature, there are research gaps regarding the prolonged effect of sand mining on marine life, under-ground water table, modeling for the prediction of geomorphological changes due to mining solely and assessing the effect of sand mining on the infrastructures. Moreover, in the Indian subcontinent, the lack of enough databases for most of the rivers was a fundamental problem for monitoring the impacts of aggregate extraction. Future research should emphasize the potential gaps to augment the sand mining field and its effects.

This manuscript titled “Ecological and Geomorphic Fallout of Escalating River Mining Activities: A Review” is a review paper that provides an examination of the multiple effects of river sand extraction from a worldwide viewpoint. One key point to stress is the clear and accessible nature of the data used in this review. All the material and datasets utilized in the analysis are sourced from open-access repositories and publications, assuring their availability to the entire scientific community and interested readers. Additionally, the data utilized in this study may be publicly accessed online, further encouraging transparency, reproducibility, and research on the subject.

  1. Abdulazeez, A. (2016). A Review on the Impact of River and Inland Sand Mining on Nigerian River Basins. A Phd Thesis Submitted at Federal University Dutsinma, Katsina State Nigeria.
  2. Alvarado-Villalon, F., Harrison, D.J. and Steadman, E.J. (2003). Alluvial mining of aggregates in Costa Rica.
  3. Arun, L.K. (1999). Patterns and processes of fish assemblage in Periyar Lake-valley system of Southern Western Ghats. KFRI Research Report, Kerala Forest Research Institute, Peechi, Kerala, 142pp.
  4. Ashraf, M.A., Maah, M.J., Yusoff, I., Wajid, A. and Mahmood, K. (2011). Sand mining effects, causes and concerns: A case study from Bestari Jaya, Selangor, Peninsular Malaysia. Scientific Research and Essays, v.6(6), p.1216-1231. doi: 10.5897/SRE10.690
  5. Ayyam, V., Palanivel, S. and Chandrakasan, S. (2019). Coastal ecosystems of the Tropics-adaptive management. Springer.
    CrossRef
  6. Bari, E. and Haque, S.E. (2022). Legal and Illicit Sand Mining Practice in Bangladesh: Exploring Supply Chain and Its Value. Journal of Illicit Economies and Development, 4(1). doi: 10.31389/jied.149
    CrossRef
  7. Barman, B., Kumar, B. and Sarma, A.K. (2019). Impact of sand mining on alluvial channel flow characteristics. Ecological Engineering, v.135, p.36-44. doi: 10.1016/j.ecoleng.2019.05.013
    CrossRef
  8. Bhattacharya, R., Dolui, G. and Das Chatterjee, N. (2019). Effect of instream sand mining on hydraulic variables of bedload transport and channel planform: an alluvial stream in South Bengal basin, India. Environmental Earth Sciences, v.78, p.1-24. doi: 10.1007/s12665-019-8267-3
    CrossRef
  9. Byrnes, M.R. and Hiland, M.W. (1995). Large-scale sediment transport patterns on the continental shelf and influence on shoreline response: St. Andrew Sound, Georgia to Nassau Sound, Florida, USA. Marine Geology, v.126(1-4), p.19-43. doi: 10.1016/0025-3227(95)00064-6
    CrossRef
  10. Cao, Z., Duan, H., Feng, L., Ma, R. and Xue, K. (2017). Climateand human-induced changes in suspended particulate matter over Lake Hongze on short and long timescales. Remote Sensing of Environment, v.192, p.98-113.
    CrossRef
  11. Collins, B. and Dunne, T. (1990). Fluvial geomorphology and rivergravel mining: a guide for planners, case studies included (Vol. 98). California Department of Conservation, Division of Mines and Geology.
  12. County, L. (1992). Lake County aggregate resource management plan. Lake County Planning Department. Resource Management Division, Lakeport, California. Draft.
  13. Cowx, I.G. and Welcomme, R.L. (1998). Rehabilitation of rivers for fish: a study undertaken by the European Inland Fisheries Advisory Commission of FAO. Food & Agriculture Org.
  14. Damodaran, K.T. and Balakrishnan, P. (2018). Saline Water Intrusion into the Coastal Aquifers of the Periyar River Basin, Central Kerala, India. Urban Ecology, Water Quality and Climate Change, p.367-387. doi: 10.1007/978-3-319-74494-0_28
    CrossRef
  15. Department of Economic and Social Affairs/United Nations Statistics Division (2018). United Nations 2018 Comtrade database. https://comtrade.un.org/.
  16. Eslami, S., Hoekstra, P., Nguyen Trung, N., Ahmed Kantoush, S., Van Binh, D., Duc Dung, D., Tran Quang, T. and van der Vegt, M. (2019). Tidal amplification and salt intrusion in the Mekong Delta driven by anthropogenic sediment starvation. Scientific Reports, v.9(1), 18746. https://doi.org/10.1038/s41598-019-55018-9
    Pubmed KoreaMed CrossRef
  17. Gavriletea, M.D. (2017). Environmental impacts of sand exploitation. Analysis of sand market. Sustainability, v.9(7), 1118. doi: 10.3390/su9071118
    CrossRef
  18. Geology, California. D. of M. and, & Goldman, H.B. (1964). Sand and Gravel in California-an Inventory of Deposits, PT. B: Central California. California. Division of Mines and Geology.
  19. Harrison, D.J., Fidgett, S., Scott, P.W., MacFarlane, M., Mitchell, P., Eyre, J.M. and Weeks, J.M. (2005). Sustainable river mining of aggregates in developing countries. Geological Society, London, Special Publications, v.250(1), p.35-45. doi: 10.1144/GSL.SP.2005.250.01.05
    CrossRef
  20. Harvey, M.D. and Schumm, S.A. (1987). Response of Dry Creek, California to land use change, gravel mining and dam closure. IAHS-AISH Publication, v.165, p.451-460.
  21. Herrling, B. (1982). Artificial groundwater recharge in Quaternary gravel aquifers in the foreland of the Alps.
  22. Hill, L. and Kleynhans, C.J. (1999). Preliminary Guidance document for Authorisation and Licensing of Sand Mining/Gravel Extraction, in terms of Impacts on Instream and Riparian Habitats. Institute for Water Quality Studies.
  23. Islam, M.R., Begum, S.F., Yamaguchi, Y. and Ogawa, K. (1999). The Ganges and Brahmaputra rivers in Bangladesh: basin denudation and sedimentation. Hydrological Processes, v.13(17), p.2907-2923. doi: 10.1002/(SICI)1099-1085(19991215)13:17%3C2907::AIDHYP906%3E3.0.CO;2-E
    CrossRef
  24. Islam, N. (1992). Indo‐Bangladesh common rivers: The impact on Bangladesh. Contemporary South Asia, v.1(2), p.203-225. doi: 10.1080/09584939208719682
    CrossRef
  25. Jose, M.K., Shantanu, K.Y. and Venkatesh, B. (2014). A study of effect of sand mining on riverine environment. 19th International Conference on Hydraulics, Water Resources, Coastal and Environmental Engineering HYDRO, 18-20.
  26. Kondolf, G.M. (1994). Geomorphic and environmental effects of instream gravel mining. Landscape and Urban Planning, v.28(2-3), p.225-243. doi: 10.1016/0169-2046(94)90010-8
    CrossRef
  27. Kurup, B.M., Radhakrishnan, K.V and Manojkumar, T.G. (2004). Biodiversity status of fishes inhabiting rivers of Kerala (S. India) with special reference to endemism, threats and conservation measures. Proceedings of LARS2. 2nd Large Rivers Symposium. Mekong River Commission and Food and Agricultural Organization, 163-182.
  28. Lach, J. and Wyżga, B. (2002). Channel incision and flow increase of the upper Wisłoka River, southern Poland, subsequent to the reafforestation of its catchment. Earth Surface Processes and Landforms: The Journal of the British Geomorphological Research Group, v.27(4), p.445-462. http://dx.doi.org/10.1002/esp.329
    CrossRef
  29. Loc, H.H., Van Binh, D., Park, E., Shrestha, S., Dung, T.D., Son, V.H., Truc, N.H.T., Mai, N.P. and Seijger, C. (2021a). Intensifying saline water intrusion and drought in the Mekong Delta: From physical evidence to policy outlooks. Science of the Total Environment, v.757, 143919. doi: 10.1016/j.scitotenv.2020.143919
    Pubmed CrossRef
  30. Loc, H.H., Van Binh, D., Park, E., Shrestha, S., Dung, T.D., Son, V.H., Truc, N.H.T., Mai, N.P. and Seijger, C. (2021b). Intensifying saline water intrusion and drought in the Mekong Delta: From physical evidence to policy outlooks. Science of the Total Environment, v.757, 143919. doi: 10.1016/j.scitotenv.2020.143919
    Pubmed CrossRef
  31. Lu, X.X., Zhang, S.R., Xie, S.P. and Ma, P.K. (2007). Rapid channel incision of the lower Pearl River (China) since the 1990s as a consequence of sediment depletion. Hydrology and Earth System Sciences, v.11(6), p.1897-1906. doi: 10.5194/hess-11-1897-2007
    CrossRef
  32. Matlock, W.G. (1965). The effect of silt-laden water on infiltration in alluvial channels. The University of Arizona.
  33. Milliman, J.D. and Meade, R.H. (1983). World-wide delivery of river sediment to the oceans. The Journal of Geology, v.91(1), p.1-21. doi: 10.2307/30060512
    CrossRef
  34. Newell, R.C., Hitchcock, D.R. and Seiderer, L.J. (1999). Organic enrichment associated with outwash from marine aggregates dredging: a probable explanation for surface sheens and enhanced benthic production in the vicinity of dredging operations. Marine Pollution Bulletin, v.38(9), p.809-818. doi: 10.1016/S0025-326X(99)00045-4
    CrossRef
  35. Padmalal, D., Maya, K., Padmalal, D. and Maya, K. (2014). Sand mining: the world scenario. Sand Mining: Environmental Impacts and Selected Case Studies, 57-80. http://dx.doi.org/10.1007/978-94-017-9144-1_5
    CrossRef
  36. Padmalal, D., Maya, K., Sreebha, S. and Sreeja, R. (2008). Environmental effects of river sand mining: a case from the river catchments of Vembanad lake, Southwest coast of India. Environmental Geology, v.54, p.879-889. http://dx.doi.org/10.1007/s00254-007-0870-z
    CrossRef
  37. Peduzzi, P. (2014). Sand, rarer than one thinks. Environmental Development, v.11(208-218), 682.
    CrossRef
  38. Petit, F., Poinsart, D. and Bravard, J.-P. (1996). Channel incision, gravel mining and bedload transport in the Rhône river upstream of Lyon, France (“canal de Miribel”). Catena, v.26(3-4), p.209-226. doi: 10.1016/0341-8162(95)00047-X
    CrossRef
  39. Piyadasa, R.U.K. (2011). River sand mining and associated environmental problems in Sri Lanka. Sediment Problems and Sediment Management in Asian River Basins, p.148-153.
  40. Rabbani, M.G. and Panday, P.K. (2022). Sand Extraction and Its Impact on the Livelihood of Rural People of Bangladesh: Evidence from Brahmaputra River. International Journal of Research and Innovation in Social Science, v.6(5), p.801-807.
  41. Rahman, M.M., Hasan, M.S., Eusufzai, M.K. and Rahman, M.M. (2021). Impacts of dredging on fluvial geomorphology in the Jamuna river, Bangladesh. Journal of Geoscience and Environment Protection, v.9(6), p.1-20. doi: 10.4236/gep.2021.96001
    CrossRef
  42. Rege, A. (2016). Not biting the dust: using a tripartite model of organized crime to examine India’s Sand Mafia. International Journal of Comparative and Applied Criminal Justice, v.40(2), p.101-121. doi: 10.1080/01924036.2015.1082486
    CrossRef
  43. Rinaldi, M. (2003). Recent channel adjustments in alluvial rivers of Tuscany, Central Italy. Earth Surface Processes and Landforms: The Journal of the British Geomorphological Research Group, v.28(6), p.587-608. http://dx.doi.org/10.1002/esp.464
    CrossRef
  44. Rinaldi, M., Wyżga, B. and Surian, N. (2005). Sediment mining in alluvial channels: physical effects and management perspectives. River Research and Applications, v.21(7), p.805-828. doi: 10.1002/rra.884
    CrossRef
  45. Sandecki, M. (1989). Aggregate mining in river systems. California Geology, v.42(4), p.88-94.
  46. Santhosh, K.G., Subhani, S.M. and Bahurudeen, A. (2021). Cleaner production of concrete by using industrial by-products as fine aggregate: A sustainable solution to excessive river sand mining. Journal of Building Engineering, 42, 102415. doi: 10.1016/j.jobe.2021.102415
    CrossRef
  47. Sear, D.A. and Archer, D. (1998). Effects of Gravel Extraction on the Stability of Gravelbed Rivers: a Case Study from the Wooler Water, Northumberland, UK.
  48. Shields, F.D., Knight, S.S. and Cooper, C.M. (1994). Effects of channel incision on base flow stream habitats and fishes. Environmental Management, v.18, p.43-57. doi: 10.1007/BF02393749
    CrossRef
  49. Sood, A. and Mathukumalli, B.K.P. (2011). Managing international river basins: reviewing India-Bangladesh transboundary water issues. Intl. J. River Basin Management, v.9(1), p.43-52. doi: 10.1080/15715124.2011.553832
    CrossRef
  50. Sreebha, S. and Padmalal, D. (2011a). Environmental impact assessment of sand mining from the small catchment rivers in the southwestern coast of India: a case study. Environmental Management, v.47, p.130-140. doi: 10.1007/s00267-010-9571-6
    Pubmed CrossRef
  51. Sreebha, S. and Padmalal, D. (2011b). Environmental impact assessment of sand mining from the small catchment rivers in the Southwestern Coast of India: A case study. Environmental Management, v.47(1), p.130-140. https://doi.org/10.1007/S00267-010-9571-6
    Pubmed CrossRef
  52. Sunilkumar, R. (2002). Impact of sand mining on benthic fauna: a case study from Achankovil river—an overview. Catholicate College, Pathanamthitta District, Kerala, 38.
  53. Supriharyono, S. (2004). Effects of sand mining on coral reefs in Riau Islands. Journal of Coastal Zone Management, v.7(2), p.89-100.
  54. Surian, N. and Rinaldi, M. (2003). Morphological response to river engineering and management in alluvial channels in Italy. Geomorphology, v.50(4), p.307-326. doi: 10.1016/S0169-555X(02)00219-2
    CrossRef
  55. Surian, N., Rinaldi, M. and Pellegrini, L. (2011). Channel adjustments and implications for river management and restoration. Geografia Fisica e Dinamica Quaternaria, v.34(1), p.145-152.
  56. Wu, G., de Leeuw, J., Skidmore, A.K., Prins, H.H.T. and Liu, Y. (2007). Concurrent monitoring of vessels and water turbidity enhances the strength of evidence in remotely sensed dredging impact assessment. Water Research, v.41(15), p.3271-3280. doi: 10.1016/j.watres.2007.05.018
    Pubmed CrossRef
  57. Wyżga, B. (2007). 20 A review on channel incision in the Polish Carpathian rivers during the 20th century. Developments in Earth Surface Processes, v.11, p.525-553. doi: 10.1016/S0928-2025(07)11142-1
    CrossRef
  58. Young, R. and Griffith, A. (2009). Documenting the global impacts of beach sand mining. EGU General Assembly Conference Abstracts, 11593.
  59. Zou, W., Tolonen, K.T., Zhu, G., Qin, B., Zhang, Y., Cao, Z., Peng, K., Cai, Y. and Gong, Z. (2019). Catastrophic effects of sand mining on macroinvertebrates in a large shallow lake with implications for management. Science of the Total Environment, v.695, 133706. doi: 10.1016/j.scitotenv.2019.133706
    Pubmed CrossRef

Article

Review

Econ. Environ. Geol. 2024; 57(3): 293-303

Published online June 30, 2024 https://doi.org/10.9719/EEG.2024.57.3.293

Copyright © THE KOREAN SOCIETY OF ECONOMIC AND ENVIRONMENTAL GEOLOGY.

Ecological and Geomorphic Fallout of Escalating River Mining Activities: A Review

Sk. Rakibul Islam, Rafi Uddin*, Miftahul Zannat, Jahangir Alam

Department of Civil Engineering, Bangladesh University of Engineering and Technology (BUET), Dhaka-1000, Bangladesh

Correspondence to:*1704141@ce.buet.ac.bd

Received: November 10, 2023; Revised: June 2, 2024; Accepted: June 3, 2024

This is an Open Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided original work is properly cited.

Abstract

River mining, the extraction of sand and gravel from riverbeds, is rising at an alarming rate to keep pace with the increasing demand for construction materials worldwide. The far-reaching deleterious effects of river mining include the lowering of water levels, the augmentation of turbidity, and the erosion of riverbanks, i.e., the disruption of water flow and alteration of river morphology. Aggregates demand, geolocation, and the economy of Bangladesh accelerated illegal extraction. However, limited research has been carried out in this region, despite the severe impact on aquatic and terrestrial ecosystems. To address the corresponding consequences and direct the scope for further research, it is required to evaluate existing studies of other countries having similarities in river morphology, climate, economy, and other related parameters. In this respect, based on previous studies, the effects of sand extraction are particularly prominent in India, having 54 cross-boundary rivers with Bangladesh. The geological profile of numerous rivers in the past decades has been altered due to natural aggregate mining in the Indian subcontinent. Hence, this study focused on relevant research in this region. However, the existing research only focuses on the regional portion of the aforementioned international rivers, which lacks proper assessments of these rivers, taking into account especially the mining effects. Moreover, several global rivers that have similarities with Bangladeshi rivers, considering different parameters, are also included in this study. The findings of this article underline the pressing need for more efficacious measures to address the adverse effects of river mining and safeguard ecosystems and communities globally, especially in the Indian subcontinent, where the situation is particularly vulnerable. For this reason, targeting the aforementioned region, this review highlights the global evidence in assessing the future effects of river mining and the need for further research in this field.

Keywords sand extraction, riverbed, ecosystem, morphology, and channel instability

Research Highlights

  • River mining, the extraction of sand and gravel from riverbeds, is increasing in developing countries, causing detrimental effects such as altered river morphology, reduced water levels, increased turbidity, and erosion, endangering aquatic and benthic life. Bangladesh, along with the Indian subcontinent, is particularly vulnerable to these impacts due to extensive natural aggregate mining. Urgent measures are indispensable to address these adverse consequences, emphasizing the importance of further research to assess and mitigate the future effects of river mining.

1. Introduction

Sand mining and trading is a common sector in the construction industry. Availability and easy access to riverbeds make it popular, especially in developing countries. The total value created by the sand industry was equivalent to USD 1.71 billion in 2016 in the United States (Department of Economic and Social Affairs/United Nations Statistics Division, 2018). The natural sedimentation rate somehow meets the requirement of fine aggregates having favorable physical properties as a building material (Harrison et al., 2005), (Geology & Goldman, 1964). However, mining sand from flood plains disrupts the natural flow of water and alters the sediment's accumulation and movement patterns, which, as a result, threatens the health of the aquatic environment. In fact, floodplain mining acts as a highpowered suction pump degrading soil, water quality, and the aesthetic impact of the area (Sreebha & Padmalal, 2011a). Moreover, mining indirectly changes sediment transport rates, causes the widening and deepening of river channels, and the development of river bluffs and lumps which can exacerbate the issue (Jose et al., 2014), (Sreebha & Padmalal, 2011a). Increases in turbidity, river bank erosion, land degradation, salinity intrusion, and lowered water tables are a few of the indirect consequences of uncontrolled aggregate mining from stream beds (Piyadasa, 2011).

Considering the geology, river networks, and corresponding sedimentation, Bangladesh, the largest delta in the world, is now in a blooming phase of the construction industry. Three major rivers, the Ganges, the Brahmaputra, and the Meghna, are among the most sediment-laden rivers in the world. These rivers, with their numerous tributaries and distributaries, built up the Ganges–Brahmaputra–Meghna (GBM) Basins (Figure 1), These three rivers originate and flow through Nepal, Bhutan, Tibet region of China and India before entering Bangladesh and finally discharging into the Bay of Bengal. However, with approximately 90% of the catchment area of the total river system located outside the country, Bangladesh's situation with regard to surface water is very vulnerable. Fifty-seven rivers are common in India and Bangladesh (Islam, 1992; Milliman & Meade, 1983; Sood & Mathukumalli, 2011). Every year, the cross-boundary rivers carry a large sediment load to the Bengal Basin (M. R. Islam et al., 1999).

Figure 1. Ganges–Brahmaputra–Meghna (GBM) Basins (M. R. Islam et al., 1999).

Globally, illegal sand mining is found to be very common (Rege, 2016; Young & Griffith, 2009); particularly in developing countries where government regulations are relatively weaker (Gavriletea, 2017). For instance, in India, in the discourse of sand mining, ‘sand mafia’ is a very commonly used term (Peduzzi, 2014; Rege, 2016). In Bangladesh, the print and digital media often feature news on illegal sand mining in different river basins. However, the lack of proper statistics on sand mining in Bangladesh makes it difficult to evaluate the consequences of sand mining (Bari & Haque, 2022; Rabbani & Panday, 2022). While the detrimental effects of river sand mining are well documented globally, there is a significant knowledge gap regarding the specific consequences in Indian subcontinent, particularly vulnerable due to its dependence on these transboundary rivers and the booming construction industry. This review aims to bridge this gap by analyzing existing research on sand mining in regions with similar characteristics globally and attribute similar characteristics in the domain of Indian subcontinent, informing future research directions.

2. Effect of Sand Mining on River Morphology in the Indian Subcontinent

The presence of sand mining has significant effects on morphological characteristics such as channel bed degradation, erosion of riverbanks, and change in the plan form of a river (Collins & Dunne, 1990; Sear & Archer, 1998). The mechanism behind the morphology alteration is related to hydrodynamic characteristics, including velocity profile, higher order moments, and turbulent kinetic energy fluxes in the pit region that affect the morphology and bedload transport of the channel (Barman et al., 2019).

In the southern part of India, the Periyar River is of utmost significance to the economy of Kerala. The morphology of this river is similar to other perennial rivers in that region. Prolonged sand mining in the Periyar River for the industrialization and urbanization of Kerala recorded an annual bed lowering of 0.19 m/year (Figure 2). From 1975 to 1995, approximately 50% reduction in channel depth was observed. The lowering intensity increased markedly in the last 2–3 decades (Padmalal et al., 2008). Similar to the Periyar River, mining activities also disrupted the natural flow of the river Ganga by dividing it into smaller stream sections (Kamboj & Kamboj, 2019). However, limited studies lack the proper documentation and data in this region. The dredging effect, to some extent, can represent the scenario in Jamuna River (Figure 3), including the changes in the width of the river/channel, bank line shifting, channel migration tendency, and incidence map of the river/channel in the vicinity of the study reach (around Jamuna Bridge and Sirajganj Hard Point area) (Rahman et al., 2021).

Figure 2. Riverbed lowering of Periyar river from 1980 – 2000 (Modified from Padmalal et al., 2008).
Figure 3. Effect of Dredging in Jamuna River for the year 2000 to 2018 (Rahman et al., 2021).

To illustrate the challenges faced by non-perennial rivers, we examine the Kangsabati River located in West Bengal, India. This seasonal alluvial river shares characteristics with the braided rivers of Bangladesh, and both face the additional stress of sand extraction activities. The Shields parameter, which is used to calculate the initiation of motion of sediment in a fluid flow is highly affected in this river, resulting in reduced transport capacity and initiated turbulent flow in pit sites, which gradually converted into a pool (Figure 4) (Bhattacharya et al., 2019).

Figure 4. Channel geometry from Raipur to Bikrampur between 2002 and 2016 (Modified from Bhattacharya et al., 2019).

3. Channel Incision and Narrowing

Changes in the rate of bed-material supply result in the transformation of channel geometry. Hence, depending on the changes in flow rate and supply of sediment, river channels may be evolved into several bed-form units. An imbalanced supply of deposits and transportation capacity of the stream causes the incision (downward cutting), which is basically a natural process. However, human activities, including agriculture, dam construction, sand mining, and imposition of erosion control, can accelerate the process of incision. Lowering of base levels for the tributaries due to channel incision consequently causes the destabilization of the entire watershed landscape (Lach & Wyżga, 2002; Shields et al., 1994; Wyżga, 2007). Being one of the most harmful human activities, sand mining significantly reduces the downstream flow of sediments and speeds up the incision, which can proceed up to tributaries (Ashraf et al., 2011; Harvey & Schumm, 1987). Hence, the impacts of sand mining on river geomorphology are required to be better understood (Padmalal et al., 2014).

In active channels, excavating a mining pit can alter the stream bed profile and create a knick point with a steeper gradient which attributes increased stream power, causing bed erosion. The process of such erosion is called headcutting or knick-point migration. Head-cutting transports a considerable amount of stream bed material to be deposited in the excavated areas (Figure 5). Through the increase of the channel depth, pit excavation reduces the flow velocities causing sediment deposition at the mining site. Water leaving the pit has higher flow energy and fewer sediments compared to the carrying capacity of the stream. The bedload- free water causes erosion of its bed and banks and tries to regain sediment load partially. Considering the behavior of eroding the riverbed due to higher stream power, such type of water is referred to as ‘hungry water’ (Kondolf, 1994). The effects consequent channel incision of sand mining can proceed up to the mining prohibited areas, including the site of bridge construction and other engineering structures. A bridge built over the Bharathapuzha river near the Shornur locality in southwest India collapsed, suggesting significant evidence of the destructive effect of sand mining (Padmalal et al., 2014; Kondolf, 1994).

Figure 5. Incision due to instream sand mining. (a) knick point creation; (b) The knick point migration and erosion of bed downstream for hungry water (Padmalal et al., 2014).

Considering alluvial rivers, channel narrowing was exhibited as a response to river mining downstream in Italian rivers. In Piave and Sesiarivers, the narrowing process was so intense that it altered the initial morphological conditions of the rivers from Braided to Transitional (Surian & Rinaldi, 2003). In recent decades in Italy, the alluvial channels have experienced notable configuration adjustments, including narrowing up to 80% and incisions up to 8 m-10 m. (Surian et al., 2011). From the perspective of stream volume and flow, similar to major rivers in Bangladesh, The Pearl River, the second largest amount of water in China, over the last decades, experienced significant down-cutting at Makaou hydrological station (Figure 6) (Surian et al., 2011). According to several studies, down-cut records obtained from different countries of different continents are enlisted in Table 1 and shown in Figure 7.

Table 1 . Sediment mining effects on alluvial river morphology considering channel incision.

RiverCountryYearDeepest down cutReferences
JaramaSpain1960-1990s4 m(Rinaldi et al., 2005)
Po RiverItaly1880-1990s1-6 m(Rinaldi et al., 2005)
Manawatu RiverNew Zealand1967-19760.25 m(Rinaldi et al., 2005)
Wisłoka RiverPoland1950s-1990s2.6 m(Rinaldi et al., 2005)
Gaoyao, PearlChina19956.3 m(Lu et al., 2007)
Makou, PearlChina19987.1 m(Petit et al., 1996)
Sanshui, PearlChina20035.8 m(Rinaldi et al., 2005)
Rhone RiverFrance1847-19524.5 m(Petit et al., 1996)

Figure 6. Cross-section channel profiles in different years between 1990 and 2003 at Sanshui station (Modified from Surian et al., 2011).
Figure 7. Alluvial rivers with down-cut records across different countries of different continents.

Sand mining significantly alters channel geometry and causes incision, destabilizing watershed landscapes and impacting tributaries. This phenomenon, observed globally, has serious implications for the Indian subcontinent's dynamic river systems, such as in Bangladesh and India. For example, the collapse of a bridge over the Bharathapuzha River in India highlights the urgent need for stringent monitoring, regulation, and community engagement to manage sand mining. Comparative studies from Italy and China reveal similar issues, providing valuable insights for mitigating these effects locally. Addressing sand mining impacts requires a multifaceted approach, including adaptive infrastructure design and leveraging global research to protect riverine ecosystems and dependent communities in the Indian subcontinent.

4. Channel Instability and Impacts on Riparian Zones

Geomorphological changes, including alteration of bed level in rivers are also accompanied by lateral instability, which triggers bank erosion and channel migration (Rinaldi et al., 2005). In Central Italy, Southern Poland, and China, it is emphasized that instream sand mining is a prominent cause of incidents such as rapid channel incision and subsequent river bank failure (Rinaldi et al., 2005; Lu et al., 2007; Rinaldi, 2003) Along with other indirect ecological effects, this channel instability may also cause significant riparian vegetation loss and direct habitat loss for species (Newell et al., 1999; Sandecki, 1989). Notable alteration of bed-level in Arno River, Italy, was observed over the last 50 years (Figure 8). The mechanisms behind the loss of vegetation and the consequent effect on aquatic life related to the incision-induced bank failure and streambed shallowing (Figure 9), which cause the loss of hectares of fertile land, valuable timber resources, and wildlife habitats in riparian areas. Mining-induced bed degradation and other channel changes may not develop for several years until significant channel-adjustment flows occur, and adjustments may continue long after extraction has ended (Abdulazeez, 2016). Similarly, in the subcontinent, such instability can result in the loss of fertile land, timber resources, and wildlife habitats. The effects of mininginduced bed degradation and channel adjustments may persist long after extraction has ceased, necessitating proactive management and mitigation strategies.

Figure 8. Alteration of bed-level along the Arno River. (A) Location of dams, alluvial reaches, and Arno River system mining sites before 2000. (B) Lowering of bed level of the Arno River after 1845 (Rinaldi et al., 2005).
Figure 9. Diagram of channel cross sections showing (1) a typical sand-gravel bar about the low-flow channel, riparian zone, and water table, and (2) the wide shallow channel that results from unrestricted mining characterized by bank erosion, braided flow, sedimentation, and increased water temperatures (Ayyam et al., 2019).

5. Impacts on Aquatic Life

Entirely or partially to a large extent, removing the plant and soil profile threatens biodiversity and aquatic (Newell et al., 1999; Sandecki, 1989). Moreover, sand mining and habitat destruction decrease the river's fish population (Arun, 1999; Kurup et al., 2004). Water turbidity resulting from mining deprives aquatic life of oxygen and photosynthesis (Supriharyono, 2004). High turbidity inhibits aquatic lifés feeding, breathing, and reproducing ability. Indiscriminate sand and river mining stir up clouds of fine organic and inorganic particles in the underlying waters, which are later transported by the river flows and collected in mining-free zones (Sreebha & Padmalal, 2011b). Benthic creatures and beneficial food-providing insect larvae, including mayflies, dragonflies, caddisfly, and other Diptera, also get reduced for the anthropogenic activities in mining spots. India's Achankovil river is one of the notable examples of such types of impacts (Sunilkumar, 2002). Heavy equipment for sand extraction affects soil compaction and infiltration, which can be detrimental to flora and fauna (Sreebha & Padmalal, 2011a), (Hill & Kleynhans, 1999). They generate noise pollution, disturb nesting/breeding, and reduce animal diversity (Byrnes & Hiland, 1995). The riparian vegetation that serves as a resting and breeding area for migratory birds is destroyed by indiscriminate sand mining from rivers (Sreebha & Padmalal, 2011b). Riverbank slumping, channel incision, and dropping water table harm riparian plants and fauna (Sreebha & Padmalal, 2011b). Loss of instream vegetation causes spawning abnormalities in photophilic and psammophilous fishes and impacts protein and energy flow to fish-feeding aquatic and terrestrial organisms (Cowx & Welcomme, 1998). Macroinvertebrates collapse was also observed in a study due to habitat deterioration in sand mining sites (Zou et al., 2019). Furthermore, excessively piled and discarded mining waste, organic matter, and oil leaks from machinery and vehicles used for excavation contribute to a rise in shortterm turbidity (Ashraf et al., 2011 ;Wu et al., 2007; Cao et al., 2017).

While sand mining significantly disrupts aquatic ecosystems, posing severe threats to biodiversity in the Indian subcontinent applying the global insights can help mitigate the destruction of riparian vegetation, prevent riverbank erosion, and maintain healthy aquatic ecosystems, ensuring the sustainability of these vital resources.

6. Lowering of Groundwater Table and Intrusion of Saline Water

The natural balance between the freshwater and the saline water is disturbed by the rampant illegal sand mining and also the excess groundwater withdrawals. Sand mining lowers the groundwater levels, reduces freshwater flow into the coastal aquifers, and ultimately causes saline water intrusion (Damodaran & Balakrishnan, 2018). The incision in minor river valleys with instream mining may diminish alluvial aquifer storage by 1% - 6%, according to Lake County, California's Planning Department (County, 1992). Sand mining causes vast, deep excavations in the riverbed, lowering the groundwater table and leaving wells on the embankments (Matlock, 1965; Herrling, 1982). Wells near sand mines are noticed in the gradual lowering of the water table in India's lowlands and midlands. More than 60% of Manimala river's floodplain wells are severely water-stressed due to sand mining (Sreebha & Padmalal, 2011b). Moreover, in Sri Lanka, sand extraction tripled in the Nilwala River, causing the lower river reaches to move inland by 50 kilometers in the last two decades (Piyadasa, 2011).

Saline water intrusion in the Vietnamese Mekong Delta (VMD) is primarily driven by three human activities: riverbed incision (caused by both riverbed mining and dam construction), sea level rise, and land subsidence corroborated by experimental studies (Loc et al., 2021a). According to an investigation of hourly-to-daily hydrological data series from 11-gauge stations across the (VMD), riverbed mining can incise the channel by up to 15 cm/year and aggravate saline intrusion (Loc et al., 2021b). Eslami et al. (2019) predicted that a 2 m riverbed incision in the coastal channel might increase salinity intrusion length by 5 km and salt concentration by 1.5 Practical Salinity Unit (PSU) 20 km from the sea (Eslami et al., 2019). Based on the experimental investigation in Periyar river, the freshwater and saline water interface is demarcated (Figure 10) (Damodaran & Balakrishnan, 2018).

Figure 10. Fresh–saline groundwater interface of the study area (Damodaran & Balakrishnan, 2018).

Understanding the relationship between sand mining and the lowering of groundwater tables, as well as the intrusion of saline water, is crucial for addressing environmental and socio-economic challenges in the Indian subcontinent. By understanding and addressing these dynamics, policymakers and stakeholders in the Indian subcontinent can develop strategies to mitigate the adverse impacts of sand mining on groundwater resources and coastal ecosystems, safeguarding both environmental integrity and community well-being.

7. Conclusion

The aim of this research is to review the multidisciplinary effects of sand mining in different regions of the world and especially in the Indian subcontinent. Based on the review, the following presumptions can be drawn:

1. In recent decades, indiscriminate sand extraction from river beds has escalated to maintain the same rate of progress in the construction industry. However, in developing countries, there are no established guidelines for harvesting river sand (Alvarado-Villalon et al., 2003).

2. Excessive sand mining seeds morphological changes, including channel incisions and narrowing as well as falling groundwater levels, remarkably disrupted river flow, which leads to instability in the surrounding ecosystem and the communities depending on it.

3. Knick point migration directly related to sand mining is frequently observed in most of the significant rivers in the Indian subcontinent. Cross-sectional properties of the rivers are severely affected in the long run.

4. As a secondary effect of sand mining, disruption in standard aquatic biological processes due to increased turbidity, BOD, and the release of toxic compounds into the water, makes it harder for pelagic and benthic organisms and plants to survive.

5. Exposure to radioactive materials from extraction sites impose serious health concern depending on the availability of such substances, and aquatic life is not out of such danger.

6. In situations where local development necessitates the collection of aggregates, the challenge lies in balancing construction demands with environmental sustainability. To address this issue, one viable alternative as suggested by literature is the reuse of industrial by-products as substitutes for river sand in concrete production, specifically as aggregates. This approach not only mitigates the environmental impact associated with extensive river sand mining but also provides a sustainable solution to managing industrial waste, thereby reducing land pollution. By adopting this method, construction projects can maintain a steady supply of aggregates while contributing to a more sustainable and environmentally conscious industry(Santhosh et al., 2021).

Though the existing studies focused on the effects of sand mining from different perspectives, still in the reviewed literature, there are research gaps regarding the prolonged effect of sand mining on marine life, under-ground water table, modeling for the prediction of geomorphological changes due to mining solely and assessing the effect of sand mining on the infrastructures. Moreover, in the Indian subcontinent, the lack of enough databases for most of the rivers was a fundamental problem for monitoring the impacts of aggregate extraction. Future research should emphasize the potential gaps to augment the sand mining field and its effects.

Availability of Data and Material

This manuscript titled “Ecological and Geomorphic Fallout of Escalating River Mining Activities: A Review” is a review paper that provides an examination of the multiple effects of river sand extraction from a worldwide viewpoint. One key point to stress is the clear and accessible nature of the data used in this review. All the material and datasets utilized in the analysis are sourced from open-access repositories and publications, assuring their availability to the entire scientific community and interested readers. Additionally, the data utilized in this study may be publicly accessed online, further encouraging transparency, reproducibility, and research on the subject.

Funding

No funding was obtained for this study.

Competing Interests

The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.

Fig 1.

Figure 1.Ganges–Brahmaputra–Meghna (GBM) Basins (M. R. Islam et al., 1999).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 2.

Figure 2.Riverbed lowering of Periyar river from 1980 – 2000 (Modified from Padmalal et al., 2008).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 3.

Figure 3.Effect of Dredging in Jamuna River for the year 2000 to 2018 (Rahman et al., 2021).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 4.

Figure 4.Channel geometry from Raipur to Bikrampur between 2002 and 2016 (Modified from Bhattacharya et al., 2019).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 5.

Figure 5.Incision due to instream sand mining. (a) knick point creation; (b) The knick point migration and erosion of bed downstream for hungry water (Padmalal et al., 2014).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 6.

Figure 6.Cross-section channel profiles in different years between 1990 and 2003 at Sanshui station (Modified from Surian et al., 2011).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 7.

Figure 7.Alluvial rivers with down-cut records across different countries of different continents.
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 8.

Figure 8.Alteration of bed-level along the Arno River. (A) Location of dams, alluvial reaches, and Arno River system mining sites before 2000. (B) Lowering of bed level of the Arno River after 1845 (Rinaldi et al., 2005).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 9.

Figure 9.Diagram of channel cross sections showing (1) a typical sand-gravel bar about the low-flow channel, riparian zone, and water table, and (2) the wide shallow channel that results from unrestricted mining characterized by bank erosion, braided flow, sedimentation, and increased water temperatures (Ayyam et al., 2019).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Fig 10.

Figure 10.Fresh–saline groundwater interface of the study area (Damodaran & Balakrishnan, 2018).
Economic and Environmental Geology 2024; 57: 293-303https://doi.org/10.9719/EEG.2024.57.3.293

Table 1 . Sediment mining effects on alluvial river morphology considering channel incision.

RiverCountryYearDeepest down cutReferences
JaramaSpain1960-1990s4 m(Rinaldi et al., 2005)
Po RiverItaly1880-1990s1-6 m(Rinaldi et al., 2005)
Manawatu RiverNew Zealand1967-19760.25 m(Rinaldi et al., 2005)
Wisłoka RiverPoland1950s-1990s2.6 m(Rinaldi et al., 2005)
Gaoyao, PearlChina19956.3 m(Lu et al., 2007)
Makou, PearlChina19987.1 m(Petit et al., 1996)
Sanshui, PearlChina20035.8 m(Rinaldi et al., 2005)
Rhone RiverFrance1847-19524.5 m(Petit et al., 1996)

References

  1. Abdulazeez, A. (2016). A Review on the Impact of River and Inland Sand Mining on Nigerian River Basins. A Phd Thesis Submitted at Federal University Dutsinma, Katsina State Nigeria.
  2. Alvarado-Villalon, F., Harrison, D.J. and Steadman, E.J. (2003). Alluvial mining of aggregates in Costa Rica.
  3. Arun, L.K. (1999). Patterns and processes of fish assemblage in Periyar Lake-valley system of Southern Western Ghats. KFRI Research Report, Kerala Forest Research Institute, Peechi, Kerala, 142pp.
  4. Ashraf, M.A., Maah, M.J., Yusoff, I., Wajid, A. and Mahmood, K. (2011). Sand mining effects, causes and concerns: A case study from Bestari Jaya, Selangor, Peninsular Malaysia. Scientific Research and Essays, v.6(6), p.1216-1231. doi: 10.5897/SRE10.690
  5. Ayyam, V., Palanivel, S. and Chandrakasan, S. (2019). Coastal ecosystems of the Tropics-adaptive management. Springer.
    CrossRef
  6. Bari, E. and Haque, S.E. (2022). Legal and Illicit Sand Mining Practice in Bangladesh: Exploring Supply Chain and Its Value. Journal of Illicit Economies and Development, 4(1). doi: 10.31389/jied.149
    CrossRef
  7. Barman, B., Kumar, B. and Sarma, A.K. (2019). Impact of sand mining on alluvial channel flow characteristics. Ecological Engineering, v.135, p.36-44. doi: 10.1016/j.ecoleng.2019.05.013
    CrossRef
  8. Bhattacharya, R., Dolui, G. and Das Chatterjee, N. (2019). Effect of instream sand mining on hydraulic variables of bedload transport and channel planform: an alluvial stream in South Bengal basin, India. Environmental Earth Sciences, v.78, p.1-24. doi: 10.1007/s12665-019-8267-3
    CrossRef
  9. Byrnes, M.R. and Hiland, M.W. (1995). Large-scale sediment transport patterns on the continental shelf and influence on shoreline response: St. Andrew Sound, Georgia to Nassau Sound, Florida, USA. Marine Geology, v.126(1-4), p.19-43. doi: 10.1016/0025-3227(95)00064-6
    CrossRef
  10. Cao, Z., Duan, H., Feng, L., Ma, R. and Xue, K. (2017). Climateand human-induced changes in suspended particulate matter over Lake Hongze on short and long timescales. Remote Sensing of Environment, v.192, p.98-113.
    CrossRef
  11. Collins, B. and Dunne, T. (1990). Fluvial geomorphology and rivergravel mining: a guide for planners, case studies included (Vol. 98). California Department of Conservation, Division of Mines and Geology.
  12. County, L. (1992). Lake County aggregate resource management plan. Lake County Planning Department. Resource Management Division, Lakeport, California. Draft.
  13. Cowx, I.G. and Welcomme, R.L. (1998). Rehabilitation of rivers for fish: a study undertaken by the European Inland Fisheries Advisory Commission of FAO. Food & Agriculture Org.
  14. Damodaran, K.T. and Balakrishnan, P. (2018). Saline Water Intrusion into the Coastal Aquifers of the Periyar River Basin, Central Kerala, India. Urban Ecology, Water Quality and Climate Change, p.367-387. doi: 10.1007/978-3-319-74494-0_28
    CrossRef
  15. Department of Economic and Social Affairs/United Nations Statistics Division (2018). United Nations 2018 Comtrade database. https://comtrade.un.org/.
  16. Eslami, S., Hoekstra, P., Nguyen Trung, N., Ahmed Kantoush, S., Van Binh, D., Duc Dung, D., Tran Quang, T. and van der Vegt, M. (2019). Tidal amplification and salt intrusion in the Mekong Delta driven by anthropogenic sediment starvation. Scientific Reports, v.9(1), 18746. https://doi.org/10.1038/s41598-019-55018-9
    Pubmed KoreaMed CrossRef
  17. Gavriletea, M.D. (2017). Environmental impacts of sand exploitation. Analysis of sand market. Sustainability, v.9(7), 1118. doi: 10.3390/su9071118
    CrossRef
  18. Geology, California. D. of M. and, & Goldman, H.B. (1964). Sand and Gravel in California-an Inventory of Deposits, PT. B: Central California. California. Division of Mines and Geology.
  19. Harrison, D.J., Fidgett, S., Scott, P.W., MacFarlane, M., Mitchell, P., Eyre, J.M. and Weeks, J.M. (2005). Sustainable river mining of aggregates in developing countries. Geological Society, London, Special Publications, v.250(1), p.35-45. doi: 10.1144/GSL.SP.2005.250.01.05
    CrossRef
  20. Harvey, M.D. and Schumm, S.A. (1987). Response of Dry Creek, California to land use change, gravel mining and dam closure. IAHS-AISH Publication, v.165, p.451-460.
  21. Herrling, B. (1982). Artificial groundwater recharge in Quaternary gravel aquifers in the foreland of the Alps.
  22. Hill, L. and Kleynhans, C.J. (1999). Preliminary Guidance document for Authorisation and Licensing of Sand Mining/Gravel Extraction, in terms of Impacts on Instream and Riparian Habitats. Institute for Water Quality Studies.
  23. Islam, M.R., Begum, S.F., Yamaguchi, Y. and Ogawa, K. (1999). The Ganges and Brahmaputra rivers in Bangladesh: basin denudation and sedimentation. Hydrological Processes, v.13(17), p.2907-2923. doi: 10.1002/(SICI)1099-1085(19991215)13:17%3C2907::AIDHYP906%3E3.0.CO;2-E
    CrossRef
  24. Islam, N. (1992). Indo‐Bangladesh common rivers: The impact on Bangladesh. Contemporary South Asia, v.1(2), p.203-225. doi: 10.1080/09584939208719682
    CrossRef
  25. Jose, M.K., Shantanu, K.Y. and Venkatesh, B. (2014). A study of effect of sand mining on riverine environment. 19th International Conference on Hydraulics, Water Resources, Coastal and Environmental Engineering HYDRO, 18-20.
  26. Kondolf, G.M. (1994). Geomorphic and environmental effects of instream gravel mining. Landscape and Urban Planning, v.28(2-3), p.225-243. doi: 10.1016/0169-2046(94)90010-8
    CrossRef
  27. Kurup, B.M., Radhakrishnan, K.V and Manojkumar, T.G. (2004). Biodiversity status of fishes inhabiting rivers of Kerala (S. India) with special reference to endemism, threats and conservation measures. Proceedings of LARS2. 2nd Large Rivers Symposium. Mekong River Commission and Food and Agricultural Organization, 163-182.
  28. Lach, J. and Wyżga, B. (2002). Channel incision and flow increase of the upper Wisłoka River, southern Poland, subsequent to the reafforestation of its catchment. Earth Surface Processes and Landforms: The Journal of the British Geomorphological Research Group, v.27(4), p.445-462. http://dx.doi.org/10.1002/esp.329
    CrossRef
  29. Loc, H.H., Van Binh, D., Park, E., Shrestha, S., Dung, T.D., Son, V.H., Truc, N.H.T., Mai, N.P. and Seijger, C. (2021a). Intensifying saline water intrusion and drought in the Mekong Delta: From physical evidence to policy outlooks. Science of the Total Environment, v.757, 143919. doi: 10.1016/j.scitotenv.2020.143919
    Pubmed CrossRef
  30. Loc, H.H., Van Binh, D., Park, E., Shrestha, S., Dung, T.D., Son, V.H., Truc, N.H.T., Mai, N.P. and Seijger, C. (2021b). Intensifying saline water intrusion and drought in the Mekong Delta: From physical evidence to policy outlooks. Science of the Total Environment, v.757, 143919. doi: 10.1016/j.scitotenv.2020.143919
    Pubmed CrossRef
  31. Lu, X.X., Zhang, S.R., Xie, S.P. and Ma, P.K. (2007). Rapid channel incision of the lower Pearl River (China) since the 1990s as a consequence of sediment depletion. Hydrology and Earth System Sciences, v.11(6), p.1897-1906. doi: 10.5194/hess-11-1897-2007
    CrossRef
  32. Matlock, W.G. (1965). The effect of silt-laden water on infiltration in alluvial channels. The University of Arizona.
  33. Milliman, J.D. and Meade, R.H. (1983). World-wide delivery of river sediment to the oceans. The Journal of Geology, v.91(1), p.1-21. doi: 10.2307/30060512
    CrossRef
  34. Newell, R.C., Hitchcock, D.R. and Seiderer, L.J. (1999). Organic enrichment associated with outwash from marine aggregates dredging: a probable explanation for surface sheens and enhanced benthic production in the vicinity of dredging operations. Marine Pollution Bulletin, v.38(9), p.809-818. doi: 10.1016/S0025-326X(99)00045-4
    CrossRef
  35. Padmalal, D., Maya, K., Padmalal, D. and Maya, K. (2014). Sand mining: the world scenario. Sand Mining: Environmental Impacts and Selected Case Studies, 57-80. http://dx.doi.org/10.1007/978-94-017-9144-1_5
    CrossRef
  36. Padmalal, D., Maya, K., Sreebha, S. and Sreeja, R. (2008). Environmental effects of river sand mining: a case from the river catchments of Vembanad lake, Southwest coast of India. Environmental Geology, v.54, p.879-889. http://dx.doi.org/10.1007/s00254-007-0870-z
    CrossRef
  37. Peduzzi, P. (2014). Sand, rarer than one thinks. Environmental Development, v.11(208-218), 682.
    CrossRef
  38. Petit, F., Poinsart, D. and Bravard, J.-P. (1996). Channel incision, gravel mining and bedload transport in the Rhône river upstream of Lyon, France (“canal de Miribel”). Catena, v.26(3-4), p.209-226. doi: 10.1016/0341-8162(95)00047-X
    CrossRef
  39. Piyadasa, R.U.K. (2011). River sand mining and associated environmental problems in Sri Lanka. Sediment Problems and Sediment Management in Asian River Basins, p.148-153.
  40. Rabbani, M.G. and Panday, P.K. (2022). Sand Extraction and Its Impact on the Livelihood of Rural People of Bangladesh: Evidence from Brahmaputra River. International Journal of Research and Innovation in Social Science, v.6(5), p.801-807.
  41. Rahman, M.M., Hasan, M.S., Eusufzai, M.K. and Rahman, M.M. (2021). Impacts of dredging on fluvial geomorphology in the Jamuna river, Bangladesh. Journal of Geoscience and Environment Protection, v.9(6), p.1-20. doi: 10.4236/gep.2021.96001
    CrossRef
  42. Rege, A. (2016). Not biting the dust: using a tripartite model of organized crime to examine India’s Sand Mafia. International Journal of Comparative and Applied Criminal Justice, v.40(2), p.101-121. doi: 10.1080/01924036.2015.1082486
    CrossRef
  43. Rinaldi, M. (2003). Recent channel adjustments in alluvial rivers of Tuscany, Central Italy. Earth Surface Processes and Landforms: The Journal of the British Geomorphological Research Group, v.28(6), p.587-608. http://dx.doi.org/10.1002/esp.464
    CrossRef
  44. Rinaldi, M., Wyżga, B. and Surian, N. (2005). Sediment mining in alluvial channels: physical effects and management perspectives. River Research and Applications, v.21(7), p.805-828. doi: 10.1002/rra.884
    CrossRef
  45. Sandecki, M. (1989). Aggregate mining in river systems. California Geology, v.42(4), p.88-94.
  46. Santhosh, K.G., Subhani, S.M. and Bahurudeen, A. (2021). Cleaner production of concrete by using industrial by-products as fine aggregate: A sustainable solution to excessive river sand mining. Journal of Building Engineering, 42, 102415. doi: 10.1016/j.jobe.2021.102415
    CrossRef
  47. Sear, D.A. and Archer, D. (1998). Effects of Gravel Extraction on the Stability of Gravelbed Rivers: a Case Study from the Wooler Water, Northumberland, UK.
  48. Shields, F.D., Knight, S.S. and Cooper, C.M. (1994). Effects of channel incision on base flow stream habitats and fishes. Environmental Management, v.18, p.43-57. doi: 10.1007/BF02393749
    CrossRef
  49. Sood, A. and Mathukumalli, B.K.P. (2011). Managing international river basins: reviewing India-Bangladesh transboundary water issues. Intl. J. River Basin Management, v.9(1), p.43-52. doi: 10.1080/15715124.2011.553832
    CrossRef
  50. Sreebha, S. and Padmalal, D. (2011a). Environmental impact assessment of sand mining from the small catchment rivers in the southwestern coast of India: a case study. Environmental Management, v.47, p.130-140. doi: 10.1007/s00267-010-9571-6
    Pubmed CrossRef
  51. Sreebha, S. and Padmalal, D. (2011b). Environmental impact assessment of sand mining from the small catchment rivers in the Southwestern Coast of India: A case study. Environmental Management, v.47(1), p.130-140. https://doi.org/10.1007/S00267-010-9571-6
    Pubmed CrossRef
  52. Sunilkumar, R. (2002). Impact of sand mining on benthic fauna: a case study from Achankovil river—an overview. Catholicate College, Pathanamthitta District, Kerala, 38.
  53. Supriharyono, S. (2004). Effects of sand mining on coral reefs in Riau Islands. Journal of Coastal Zone Management, v.7(2), p.89-100.
  54. Surian, N. and Rinaldi, M. (2003). Morphological response to river engineering and management in alluvial channels in Italy. Geomorphology, v.50(4), p.307-326. doi: 10.1016/S0169-555X(02)00219-2
    CrossRef
  55. Surian, N., Rinaldi, M. and Pellegrini, L. (2011). Channel adjustments and implications for river management and restoration. Geografia Fisica e Dinamica Quaternaria, v.34(1), p.145-152.
  56. Wu, G., de Leeuw, J., Skidmore, A.K., Prins, H.H.T. and Liu, Y. (2007). Concurrent monitoring of vessels and water turbidity enhances the strength of evidence in remotely sensed dredging impact assessment. Water Research, v.41(15), p.3271-3280. doi: 10.1016/j.watres.2007.05.018
    Pubmed CrossRef
  57. Wyżga, B. (2007). 20 A review on channel incision in the Polish Carpathian rivers during the 20th century. Developments in Earth Surface Processes, v.11, p.525-553. doi: 10.1016/S0928-2025(07)11142-1
    CrossRef
  58. Young, R. and Griffith, A. (2009). Documenting the global impacts of beach sand mining. EGU General Assembly Conference Abstracts, 11593.
  59. Zou, W., Tolonen, K.T., Zhu, G., Qin, B., Zhang, Y., Cao, Z., Peng, K., Cai, Y. and Gong, Z. (2019). Catastrophic effects of sand mining on macroinvertebrates in a large shallow lake with implications for management. Science of the Total Environment, v.695, 133706. doi: 10.1016/j.scitotenv.2019.133706
    Pubmed CrossRef
KSEEG
Oct 29, 2024 Vol.57 No.5, pp. 473~664

Stats or Metrics

Share this article on

  • kakao talk
  • line

Related articles in KSEEG

Economic and Environmental Geology

pISSN 1225-7281
eISSN 2288-7962
qr-code Download